Flight MH370/2014-03-08/08-10-58 MYT: Difference between revisions

MH370 DECODED
Jump to navigation Jump to search
m Text replacement - ">Return to Flight Timeline</a>" to ">Chronology</a>"
No edit summary
Line 1: Line 1:
<noinclude> ‎</noinclude>
<noinclude>
{{#seo:
|title_mode=replace
|title=Flight MH370 Event at 2014-03-08T00:10:58Z
|description=Perth GES Log-On Interrogation; SATCOM responds normally. Sixth SATCOM �handshake�; confirms SATCOM link available.
}}‎</noinclude>
 
<noinclude>  
{{ChronologyEventDetails  
{{ChronologyEventDetails  
   |FlightPhase={{FlightPhase|}}
   |FlightPhase={{FlightPhase|}}
Line 9: Line 16:
     |EventDetails={{Time:{{FULLPAGENAME}}/Details}}
     |EventDetails={{Time:{{FULLPAGENAME}}/Details}}
     |Notes={{Time:{{FULLPAGENAME}}/Notes}}  
     |Notes={{Time:{{FULLPAGENAME}}/Notes}}  
     |ReturnToTimelineLink=<html><a href="/Flight MH370/2014-03-08/02-40 to 09-16 MYT#081058" class="nav-btn return">Chronology</a></html>
     |ReturnToTimelineLink=<html><a href="/Flight_MH370/Chronology/Phase_6#081058" class="nav-btn return">Chronology</a></html>
}}
}}‎</noinclude>
[[Category:North Indian Ocean to Southern Indian Ocean]]
<noinclude>‎</noinclude>
{{#seo:
|title_mode=replace
|title=Flight MH370 Event at 2014-03-08T00:10:58Z
}}


<includeonly> <!-- Start Chron Summary -->
<div class="chron gnd" id="#081058">
<p>8 March 2014 &nbsp; [[Flight MH370/2014-03-08/08-10-58 MYT|08:10:58 MYT]]</p>


</div>
<noinclude>  
</includeonly> <!-- End Chron Summary -->
<noinclude> ‎</noinclude>
‎{{ChronEventPage
‎{{ChronEventPage
|FlightID=MH370
|FlightID=MH370
Line 41: Line 34:
|DataSource=Safety Investigation Report (2018)
|DataSource=Safety Investigation Report (2018)
|DataItems=1.9.4 / Table 1.9C (No. 21)
|DataItems=1.9.4 / Table 1.9C (No. 21)
}}
}}‎</noinclude>
 
<includeonly> <!-- Start Chron Summary -->
<div class="chron gnd" id="#081058">
<p>8 March 2014 &nbsp; [[Flight MH370/2014-03-08/08-10-58 MYT|08:10:58 MYT]]</p>
<p>Perth GES Log-On Interrogation; SATCOM responds normally. Sixth SATCOM �handshake�; confirms SATCOM link available.</p>
</div>
</includeonly> <!-- End Chron Summary -->
‎[[Category:North Indian Ocean to Southern Indian Ocean]]

Revision as of 06:08, 19 August 2026


Event Summary

08:10:58 MYT Saturday 8 March 2014

Chronology

Log-On Interrogation by the Perth GES, with a response from the SATCOM

  1. This is the sixth ‘handshake’.
  2. The SATCOM responded normally and the SATCOM link was therefore available at this time.


Event Details

  1. Safety Investigation Report MH370/01/2018 Satellite Ground Station Logs - Key Observations

    Log-On Interrogation by the Perth GES, with a response from the SATCOM

    1. This is the sixth ‘handshake’.
    2. The SATCOM responded normally and the SATCOM link was therefore available at this time.


Notes



Template:ChronEventPage